44FT DIVE EXCURSION PASSENGER TRANSPORT CATAMARAN
44FT DIVE EXCURSION PASSENGER TRANSPORT CATAMARAN
LENGTH OVER ALL
13.35M
BEAM OVER HULL
4.70M
DRAUGHT(LADEN)
0.975M
DISPLACEMENT(LADEN)
9.9TONS
FUEL CAPACITY (PETROL)
750L
FUEL CAPACITY (DIESEL)
250L
BLACK WATER CAPACITY
150L
WATER CAPACITY
500L
SEATING CAPACITY
20
SPEED MAX
18-20 KNOTS
PROPULSION
TWIN MERCURY VERADO 200HP 4-STROKE OBM ENGINES
GENERATOR
CATERPILLAR C1.5,12KW MARINE DIESEL
LAYOUTS

LAYOUTS

LAYOUTS

PART ASSEMBLY
Deck
As Shown in the G.A Drawing deck fittings are fitted and railing fitted right around. The side-walk and fore-deck along with the fly-bridge floor has been laid with Ceylon teak. The floor aft of the cockpit has a non skid finish. Loop pile carpet has been used to cover the floor inside the cockpit. The galley floor has been laid with Ceylon teak.
Wheelhouse
Cockpit Area
Helm position and console is provided to front centre with steering wheel, engine controls and instrumentation within easy reach of the helmsman. A 24000BTU Marvair air-conditioner has been fitted inside the cockpit with vents. Lounge seats have been provided on both PORT and STBD sides with a fibreglass table which when lowered acts as a base when converting the seats into beds. The ceiling inside the cockpit has been covered using Vinyl fabric.
Aft. Cockpit Area
Fiberglass cushion seats with back rests have been provided on both PORT and STBD sides. Compartments have been provided below the seats to store 40 scuba tanks. The staircase has been placed on the STBD side and a fibreglass compartment has been made for the air compressor used to fill the scuba tanks. Hatches have been placed to enter the fuel tank compartments, generator compartment and the battery compartment. Fuel fillers and water fillers have been placed on the side walk.
Fly Bridge
The fly bridge consists of a U-shaped couch and a table along with sink, tap a Barbeque grill and a Mini fridge. The Barbeque grill is placed inside a compartment which can be locked. The grill is placed on a stand which can be lifted or lowered to meet with the safety requirements set by the grill manufacturers. A console will be provided on the upper deck for control of the boat in the center forward area of the fly-bridge. Entry to the upper deck will be through a U shaped staircase which will be located in the STBD side of the boat in the mid-ship area.
Toilet
Fully functional western style toilet has been provided with a sink, tap and a pull out shower. The toilet is located in the forward section of the boat on the STBD side. Entry to the Toilet will be through a staircase in the forward section of the wheel house
Galley
The galley is located in the forward section of the boat on the port side. Entry to the Galley will be through a staircase in the forward section of the wheel house. The galley will consist of Gas Stove, counter top and sink. The Mini fridge is located below the counter top
EXTERIOR FIT OUT
Mooring Equipment
- 10” cleats will be placed on PORT and STBD sides on Fore Deck and Aft Deck. Total 4 No’s have been provided.
- 4 Units Stainless steel mooring bollards have been fitted on PORT and STBD sides on Fore and Aft Deck as shown in General Arrangement Drawing.
- Kobra 900Kg Max Pull Capacity with Hauling speed of 20Kg/min (50Kg load) Including a 2-way relay, fuse and breaker along with 2 station control (foot switches on fore deck and Main Console inside the wheel house) along with a stainless steel bow roller and 15kg galvanized steel anchor have been fitted on the fore deck.
- Additional 15Kg Galvanized Steel Anchor has been provided.
- 8mm Galvanized Steel short link chain (31 Mtrs) provided.
- 14mm P.P. Rope 30m Long has been provided.
- 2 Units 18mm Mooring Rope 10m long have been provided.
Fender
- Heavy duty “D” type rubber fender to fit around the gunwale. 5 inflatable rubber fenders have been provided.
GENERAL ARRANGEMENT
Deck
As Shown in the G.A Drawing deck fittings are fitted and railing fitted right around. The side-walk and fore-deck along with the fly-bridge floor has been laid with Ceylon teak. The floor aft of the cockpit has a non skid finish. Loop pile carpet has been used to cover the floor inside the cockpit. The galley floor has been laid with Ceylon teak.
Wheelhouse
Cockpit Area
Helm position and console is provided to front centre with steering wheel, engine controls and instrumentation within easy reach of the helmsman. A 24000BTU Marvair air-conditioner has been fitted inside the cockpit with vents. Lounge seats have been provided on both PORT and STBD sides with a fibreglass table which when lowered acts as a base when converting the seats into beds. The ceiling inside the cockpit has been covered using Vinyl fabric.
Aft. Cockpit Area
Fiberglass cushion seats with back rests have been provided on both PORT and STBD sides. Compartments have been provided below the seats to store 40 scuba tanks. The staircase has been placed on the STBD side and a fibreglass compartment has been made for the air compressor used to fill the scuba tanks. Hatches have been placed to enter the fuel tank compartments, generator compartment and the battery compartment. Fuel fillers and water fillers have been placed on the side walk.
Fly Bridge
The fly bridge consists of a U-shaped couch and a table along with sink, tap a Barbeque grill and a Mini fridge. The Barbeque grill is placed inside a compartment which can be locked. The grill is placed on a stand which can be lifted or lowered to meet with the safety requirements set by the grill manufacturers. A console will be provided on the upper deck for control of the boat in the center forward area of the fly-bridge. Entry to the upper deck will be through a U shaped staircase which will be located in the STBD side of the boat in the mid-ship area.
Toilet
Fully functional western style toilet has been provided with a sink, tap and a pull out shower. The toilet is located in the forward section of the boat on the STBD side. Entry to the Toilet will be through a staircase in the forward section of the wheel house
3.5 Galley
The galley is located in the forward section of the boat on the port side. Entry to the Galley will be through a staircase in the forward section of the wheel house. The galley will consist of Gas Stove, counter top and sink. The Mini fridge is located below the counter top.
ELECTRICAL
Electrical system
12V DC system with following navigational lights and standard lighting. a. Remote control Search light b. Battery charger with shore power connection. Wiper Three No’s to Fit on Helm screen
Batteries
4 Batteries will be provided.
Type – 12 volt x 200 Amp-hr lead acid type – 3 Units
12 volt X 90 Amp-hr lead acid type – 1 Unit
Batteries are to be charged by alternator and battery charger. Battery charger will be provided to charge the batteries by shore supply when vessel is berthed and by Generator when the vessel is at sea.
Navigational Lights and equipment
1 No Port
1 No Starboard
1 No Stern
1 No Mast Head Light
1 No Anchor Light Port and starboard lights mounted on fwd deck. Stern light will be mounted on aft of the deck. Compass 3 ½” Card Dia. 1 No
Garmin GPS (Optional) 1 No
Bulk Head Lights 13 No’s
PLUMBING SYSTEM
Bilge System Bilge Pumps No 8
Type 12V electric submersible bilge pumps of 1500 Gls/per Hr. are fitted all water tight compartments.
With separate discharge ports
ENGINE / STEERING
Propulsion
2 X 200 HP 4 STROKE Mercury Verado OBM
Steering
Manual Hydraulic steering system fitted with wheel at Console on deck and fly-bridge as with standard controls.
LIFE SAVING AND SAFETY EQUIPMENT
Life Ring 75 mm Outer Diameter 04 No’s Life Jackets for Adults 24 No’s First Aid Locker (Optional) 01 No
FIRE FIGTHING EQUIPMENT
Fire Extinguishers 06 No’s
Make fire master (BSEN3”1996)
MATERIAL AND WORKMAN SHIP
All materials, and equipment used are of marine type and suitable for the intended services and to be free of imperfections of manufacture and defects. All fibre glass material used is of best quality material and approved by Lloyds Register of shipping. All fasteners used for construction and assembly of the launch to be stainless steel and brass and where necessary to be galvanized steel.
Painting and Finishing
The vessel will be painted by gelcoating method. Under water areas will be painted with approved quality antifouling. The hull and deck colours will be as per customer requirement and subject to availability. All stainless steel fittings are polished Furniture joinery work where varnished is to be given not less than 3 coats. All trims will be out of teak trims.
TRIALS AND WARRANTY
Trials The craft will be launched and trialled in the presence of the owner’s representatives on board. Warranty The Builder will guarantee the vessel for a period of one year commencing from the date of handing over arising from any workmanship or material defects. All equipment and machinery will carry manufacturer’s warranty.